Natick Army Building 3

A large low-slope PVC roof with rooftop equipment and defined maintenance walkways.

Project overview

Building 3 in Natick combines large low-slope PVC roof areas with tightly spaced rooftop equipment. The construction sequence includes roof preparation around equipment supports and beneath the elevated mechanical platform. The later overview photographs show the membrane field, flashing transitions, and gray walkways that define maintenance routes.

Roof details

  • White membrane roof fields across multiple roof areas.
  • Flashing transitions around equipment curbs and penetrations.
  • Gray walkway routes between rooftop equipment and access points.
Long white membrane roof with rows of rooftop equipment and gray walkways, viewed from above
Overall roof layout at Natick Army Building 3. Photographed September 10, 2026.
Rooftop mechanical equipment surrounded by white membrane and connected gray walkway pads
Equipment, flashing transitions, and maintenance walkways at Building 3.

During construction

A closer look at roof preparation, installation, and the details along the way.

Roofers preparing the existing roof around a mechanical unit and its support legs at Natick Building 3
Work in progressWorking around existing equipment: roof preparation at the unit supports. Photographed January 8, 2026.
Prepared roofing surface fitted around steel supports and penetrations beneath an elevated mechanical platform
Work in progressPreparing the roof beneath the mechanical platform, including the transitions around supports and penetrations. Photographed May 7, 2026.

Plan for the people who service the roof

On an equipment-heavy roof, the scope needs to account for how maintenance teams reach each unit. Identify access points, walkway routes, equipment curbs, and penetration details when planning roofing work so those requirements are included from the start.